Before Demo I Love Kickboxing
Before Demo I Love Kickboxing
After Demo I Love Kickboxing
All walls Removed Two Tenant Spaces Turned Into One.
Framing Walls for I Love Kickboxing
Backing Installed For Solid Installation When Lockers Are Installed - I Love Kickboxing
Main Hallway and Hallway to Mens Lockeroom Being Framed - I Love Kickboxing
Stub Walls Are Built To Hold Benches And To Seperate Training Area - I Love Kick Boxing
1x4 was used as chair rail throughout the hallways and locker rooms.
Reception desk has been painted.
Training mat has been installed. — in Savage, Minnesota.
Finishing Touches - I Love Kickboxing
Finishing Touches - I Love Kickboxing
Traning Area - the benches have been put into place, signs have been hung in the training area, and all the punching bags have been evenly placed on the mat.
Completed reception desk - I Love Kickboxing
Completed reception desk - I Love Kickboxing
Removing Wall
Wall Removed
Bathroom - sink is installed and back splash is up to protect wall from water
Bathroom Finished - Ceiling and electrical all done
Doors - Both frames are installed
Making sure the door is level.
Doors hung, hardware on and both frames and doors painted